Heading for the Finish Line


Deprecated: preg_replace(): The /e modifier is deprecated, use preg_replace_callback instead in /home/nachbar/xltaweb.com/buildlog/wp-includes/functions-formatting.php on line 76

The weather gods seem to be smiling. Monday looks cool and cloudy but very calm. So Monday may well be the day to stand up the balloon.

Kevin has made good progress in spite of frittering away most of Sunday with his visiting sister. All of the Nomex panels have been attached and the bottom of each vertical seam has been finished.

That said, Kevin still has a fair bit of work to do. He still need to finish both the top and bottom load tapes, close the final vertical seam, and then join the horizontal load tapes. But that seems well within the range of reason given his habit of long nights.

Very exciting for all concerned.

Comments are closed.